AtmnirbharLogo


Swachh Bharat Mission Urban

Ministry of Housing and Urban Affairs


State:- District:- ULBs Name:-
Processing Plants
*** For adding a Solid Waste Managment Treatment nodal officer Please Login***
*** Photo Size less than 50KB and in jpg Format And RFP Details in pdf format.***
Plant ID may be kept as per entry in local Inventory of the ULB or Short name or Location by which it is popularly known.
*** Please Select the Location ON the MAP And Enter the Latitude and Longitude Values in Lat & Long fields. ***
*** Installed Capacity & Waste Processed in MT per day***
***Clustered Plants Should be entered only by State***
All input is in TPD & output in TPD/m^3 per day

       
S.NoPlant IDPlant CategorySubCategory for Waste To EnergySubCategory for Waste To CompostWork Progress(Due) Date of OperationalizationOwnershipWard NoLocatorEnter LatEnter LongWhether part of Integrated Plants (Y/N)Integrated with Plant IDPresent Waste IntakeDesigned Plant CapacityActual OutputMaximum OutputIs RDF also an Output of Waste to Compost Quantity of RDF Output (In MTPA)Project Cost (In Rupees Lakhs)SWM Plant Integrated with Collection & TransportationArrangement for Collection and Transportation (If Yes)Is Waste being sent to other ULB? Yes/NoWaste being sent to other ULB NameAmount of Waste sent to Other ULB(TPD)Is electricity an output of the plant?AddressPlant ViewMachinery ViewRFP Details
1 06/DRC/SL Material Recovery Facility Operational (Currently Processing Waste) 01/06/2019 ULB 15 LinkMap 11.64367000 92.72507300 Yes 01/DRC/BB 8.00 10.00 8.00 10.00 No 12.00 No No SCHOOL LINE COMPOST CUM RESOURCE CENTRE View RFP
2 05/CY/SL Waste To Compost Vermi Composting Operational (Currently Processing Waste) 01/06/2019 ULB 15 LinkMap 11.64367000 92.72507300 No 3.00 3.00 3.00 3.00 No 10.00 No No SCHOOL LINE COMPOST CUM RESOURCE CENTRE View RFP
3 04/CY/AK Waste To Compost Vermi Composting Operational (Currently Processing Waste) 01/10/2018 ULB 3 LinkMap 11.67447600 92.72977500 No 2.00 5.00 2.00 5.00 No 5.00 No No ANARKALI, COMPOST YARD View RFP
4 03/CY/GP Waste To Compost Vermi Composting Operational (Currently Processing Waste) 02/02/2015 ULB 10 LinkMap 11.66243800 92.74479700 No 16.00 20.00 16.00 20.00 No 21.00 No No GANDHI PARK COMPOST YARD View RFP
5 02/CY/BB Waste To Compost Aerobic Composting Operational (Currently Processing Waste) 01/03/2016 ULB 22 LinkMap 11.63923600 92.74548900 No 12.00 15.00 12.00 15.00 No 19.00 No No BROOKSHABAD COMPOST YARD View RFP
6 01/DRC/BB Material Recovery Facility Operational (Currently Processing Waste) 01/07/2015 ULB 22 LinkMap 11.63944000 92.74589600 No 32.90 50.00 32.90 50.00 No 22.00 No No BROOKSHABAD DRY RESOURCE CENTRE View RFP
Disposal
*** For adding a Solid Waste Managment Treatment nodal officer Please Login***
*** Photo Size less than 50KB and in jpg Format And RFP Details in pdf format.***
*** Please Select the Location ON the MAP And Enter the Latitude and Longitude Values in Lat & Long fields. ***
*** Waste Disposed in MT per day***


S.NoSite IDDisposal TypeWork Progress(Due) Date of OperationalizationWaste Disposed(in TPD)Is it identified for Remediation?Method for remediationAmount of legacy waste at field(Tonnes)Waste RemediatedOwnershipWard NoWaste Disposed To Dumpsite in Other CityOther City NameAmount of Waste Disposed/sent to the City.AddressIs landfill a sanitary landfill?LocatorEnter LatEnter LongFront View
1 01/ BBLF Dumpsite DPR prepared but approval from SHPC/competent authority is due 31/03/2022 34.90 Yes Bio-Mining 664300.00000 0.00000 ULB 22 No BROOKSHABAD 01/ BBLF 11.63606600 92.74933900
2 01/ BBDY Dumpsite Operational (Currently Processing Waste) 34.90 Yes Bio-Mining 664300.00000 0.00000 ULB 22 No BROOKSHABAD 01/ BBDY 11.63606600 92.74933900

Digital India   Government Data   The National Portal of India   PMIndia     Web Information Manager       CPIO